This paper presents the modification connection pipe desalting water pump and regeneration pump by adding manual valve, used in the Labuhan Angin power plant. The Labuhan Angin power plant is a type of coal-fired power station with two 115 MW of power capacity. It generates electricity by using steam to drive a rotating turbine that is coupled to a generator. Seawater that has already been processed in a water treatment plant was used in the process to create the steam. Water from the water treatment plant that has been demineralized needs to be moved to a condensate storage tank and then poured into a boiler. Based on the analysis of the current situation, when two desalting water pumps run simultaneously to supply the condensate could cause the load to drop,
especially when the power is fully loaded. Hence, the modification connection pipe desalting water pump and regeneration pump with adding manual valve could be one of the solutions.

References

PT. PLN (Persero). (2007). Kursus Prajabatan “Valve Maintenance”. Suralaya: Suralaya Education and Training Unit.

Asian Tech Limited. (2007). The Project of Indonesia Labuhan Angin Coal Fired Steam Power Plant 2 x 115 MW. Report. PT. PLN.

Higgins, L.R, Mobley, R.K, Wikof, D. (2008). Mechanical Maintenance Handbook. New York: Mc Graw Hill.

PT.PLN (Persero). (2008). Tarahan Coal Fired Steam Power Plant. Financial monthly Report December. Jakarta: PT. PLN.

PT. PLN (Persero) (2009). Financial Planning Cost Glugur Gas Turbine Power Plant. Financial monthly Report January. Jakarta: PT. PLN.