Penerapan Preventive Maintenance Alat Berat di PT Madhani Talatah Nusantara Jobsite Tanjung Enim

Authors

  • Doni Anjas Udin Program Studi Program Profesi Insinyur, Fakultas Biosains, Teknologi, dan Inovasi, Universitas Katolik Indonesia Atma Jaya
  • Maria Angela Kartawidjaja Program Studi Teknik Elektro, Fakultas Biosains, Teknologi, dan Inovasi, Universitas Katolik Indonesia Atma Jaya

DOI:

https://doi.org/10.25170/jpk.v2i05.6830

Keywords:

Preventive Maintenance, Schedule, Physical Avability

Abstract

 Preventive maintenance is a maintenance process that is carried out regularly and scheduled to prevent premature damage to heavy equipment. Maintenance planning activities are carried out as a way of reducing sudden damage. The maintenance unit schedule is carried out with timely repairs according to the schedule. This scheduling is
important considering the arrangement of humans, methods, machines and materials in the mining world more efficiently. Making a schedule correctly can create an optimal level of repair without reducing quality so that it can increase productivity. This study aims to create a unit repair planning schedule at PT Madhani Talatah Nusantara. The findings of this study are a decrease in the bread schedule, high physical availability, and reduced risk of failure, extending the life of the tool, reducing repair costs, and increasing work safety.

Author Biography

  • Maria Angela Kartawidjaja, Program Studi Teknik Elektro, Fakultas Biosains, Teknologi, dan Inovasi, Universitas Katolik Indonesia Atma Jaya

     

       

References

Buurman, B., Gkiotsalitis, K., & van Berkum, E. C. (2023). Railway Maintenance Reservation Scheduling Considering Detouring Delays and Maintenance Demand. Journal of Rail Transport Planning and Management, 25(March).

https://doi.org/10.1016/j.jrtpm.2022.100359.

Setiawan, D., Jusolihun, N., & Cahyo, W. N. (2019, December). Maintenance system design on air jet loom (AJL) machine using reliability centered maintenance (RCM) method. In IOP Conference Series: Materials Science and Engineering, 673(1): 012102. IOP Publishing.

Pasaribu, N., Yulanda, Y. A., & Wiratama, J. (2024). Evaluasi Kemajuan Tambang Jangka Pendek pada Bulan September di Pit Rencana 2023, PT Bukit Tambi, Kab. Batanghari, Provinsi Jambi. JTK (Jurnal Teknik Kebumian), 11(02): 49-60.

Rosyid, M. A., & Indrayana, M. (2023). Penjadwalan Pemeliharaan Mesin Filling Bag Menggunakan Metode Reliability Centered Maintenance (RCM) di PT SHGM. Prosiding Seminar Nasional Teknik Industri (SENASTI), 1(2023): 294–303. Retrieved from https://ojs.uajy.ac.id/index.php/SENASTI/article/view/7953.

Lacerda, P., Guedes Ramos, M. C., de Souza, R. O., Bonamigo, A., & Forcellini, F. A. (2025). Micro Downtimes Management in the Lean Perspective: An Empirical Research in a Production Bottleneck. International Journal of Industrial Engineering and Management, 16(2): 189–203. https://doi.org/10.24867/IJIEM-383.

Afiva, W. H., Atmaji, F. T. D., & Alhilman, J. (2022). Penerapan Metode Reliability Centered Maintenance (RCM) pada Perencanaan Interval Preventive Maintenance dan Estimasi Biaya Pemeliharaan Menggunakan Analisis FMECA (Studi Kasus: PT XYZ). Jurnal PASTI (Penelitian dan Aplikasi Sistem dan Teknik Industri), 13(3): 298-310.

Fahri, F., Harahap, B., & Suliawati, S. (2025). Analisis Efektivitas Preventive Maintenance dengan Metode Periodic Inspection untuk Meningkatkan Kinerja pada Unit WA800-3. Blend Sains Jurnal Teknik, 3(3): 246-267.

Febrianti, D., & Zakia, Z. (2020). Analisis Produktivitas dan Waktu Penggunaan Alat Berat Excavator pada Pekerjaan Galian Tanah. In Prosiding Seminar Nasional Pakar (pp. 123-127).

Hoi, L.W. dan Leong, T.Y. (2017), “Total Productive Maintenance and Manufacturing Performance Improvement”, Journal of Quality in Maintenance Engineering, 23(1): 2-21.

Hardt, F., Kotyrba, M., Volna, E., & Jarusek, R. (2021). Innovative approach to preventive maintenance of production equipment based on a modified tpm methodology for industry 4.0. Applied Sciences, 11(15): 6953.

B. Einabadi, M. Mahmoodjanloo, A. Baboli, and E. Rother. (2023). “Dynamic Predictive and Preventive Maintenance Planning with Failure Risk and Opportunistic Grouping Considerations: A Case Study in the Automotive Industry,” Journal of Manufacturing Systems, 69(August 2023): 292–310, doi:https://doi.org/10.1016/j.jmsy.2023.06.012.

Alqaryuti, A., Moawad, K., Salah, K., Mayyas, A., & Jayaraman, R. (2025). Blockchain-driven framework for preventive maintenance management of aircraft hydraulic systems. Discover Internet of Things, 5(1), 1-25.

Wang, Jingjing, and Honggui Han.(2025) "A Learning-Based Memetic Algorithm for Energy-Efficient Distributed Flow-Shop Scheduling with Preventive Maintenance." Swarm and Evolutionary Computation Vol 92 (2025): 101772.

Downloads

Published

2025-12-04