Metode Pelaksanaan Pekerjaan Erection Struktur Baja pada Fasilitas Refinery (Studi Kasus: RDMP Kilang Pertamina Balikpapan)
DOI:
https://doi.org/10.25170/jpk.v3i01.7430Keywords:
Method, Steel Structure, RefineryAbstract
The Refinery EPC Project is a construction project with a high level of complexity. Steel structure installation is one of the main tasks,and steel structures being used in several main facilities at the refinery. The purpose of this study is to identify efficient methods for carrying out work on the Refinery EPC Project. The methods used in this study were literature review and data collection through direct observation of the work area, and the information obtained will be compile into a document. The results of this study was the steel structure erection method is carried out systematically and sequentially, and that quality control stages are an important part of carrying out each stage of work with reference to the approved ITP. The recommended stage from this study is the Ground Assembly stage, which is related to reducing the risk of work accidents and the efficiency of crane mobility time.
References
AISC “Spesification For Structural Steel Building (ANSI/AISC 260-10)”, American Institute of Steel Construction, USA, 2019.
Eprilia, Farina Firda. (2021). Pembangunan Infrastruktur Refinery Development Master Plan di Balikpapan Sebagai Sarana Ketahanan Energi dan Revitalisasi Ekonomi. Jurnal Hukum Lingkungan Tata Ruang dan Agraria, 1(2): 247-264.
Jawat, I Wayan. (2017). Metode Pelaksanaan Konstruksi Revetment. Jurnal Paduraksa, 6(2): 161-177.
Sumaidi, M. D (2020). Perencanaan Jembatan Steel Box Girder Tipe Komposite Dua Material Baja Beton Dengan Dua Gelagar Seragam. Jurnal Envirotek, 10(2): 18-26.
Umam, Khotibul. (2020). Kajian Sistem Manajemen K3 dan Tingkat Kecelakaan Kerja Pada Pekerjaan Struktur Baja di PLTU Tanjung Jati B Unit 5 & 6 Jepara. Jurnal Disportek, 22(2): 93-101