Evaluasi Kelayakan Operasi dan Kepatuhan Standar Peralatan Listrik Berdasarkan Hasil Riksa Uji di Pabrik Indofood CBP Sukses Makmur Tbk Divisi Food Seasoning Cibitung
DOI:
https://doi.org/10.25170/jpk.v3i06.8231Keywords:
Electrical safety, electrical inspection, insulation resistance, distribution panel, grounding resistance, lightning protection systemAbstract
PT Indofood CBP Sukses Makmur Tbk, Food Seasoning Division, requires a reliable electrical system to ensure production continuity. This study evaluates the operational feasibility and electrical safety compliance of generators, AC motors, distribution panels, and lightning protection systems through inspection and technical testing. The results show that the genset components are in good condition, but the noise reaches 105.2 dB near the machine and 97.2 dB at distance of 3 meters. The AC motor has an average insulation resistance of 21.8 MΩ, DAR 1.2–1.4, and PI 1.0–1.5, meaning it can still operate with regular monitoring. The phase-to-phase voltage of the PHB is 398–400 V, indicating a stable distribution system, while the lightning conductor grounding resistance of 0.21 Ω shows effective grounding. Overall, the electrical installation is suitable for operation, with recommendations to control genset noise and regularly monitor motor insulation conditions.
References
Asep Saepudin & Nurkholis, S. (2026). Pengantar Teknik Pemeliharaan. Divya Media Pustaka.
Ardiansyah, M. D., Nugraha, A. T., & Jami’in, M. A. (2025). Perbandingan Respons Sistem Motor DC dan Motor AC Berdasarkan Identifikasi Model Menggunakan MATLAB/Simulink. Prosiding Conference of Electrical, Marine and Its Application (pp. 20-27). Surabaya: Politeknik Perkapalan Negeri Surabaya.
Badan Standardisasi Nasional. (2000). SNI 04-0225-2000: Persyaratan Umum Instalasi Listrik 2000 (PUIL 2000). Jakarta: Badan Standardisasi Nasional.
Oktavianto, A., & Joko, J. (2025). Analisis Kelayakan Motor Induksi 3 Fasa Berdasarkan Tahanan Isolasi dan Indeks Polaritas Di PT. PLN Indonesia Power Grati PGU. Jurnal Teknik Elektro, 14(2), 108-113.
Ramadhan, M. D. J., & Baniardho, R. (2026). Analisa Winding Insulation Motor Induksi Tiga Fasa Circulation Water Pump-B Di PT PLN Indonesia Power UBP Cilegon. JuTEkS (Jurnal Teknik Elektro dan Sains), 13(1), 396-407.
Sumanto & Bangsa, I. A. (2023). Analisis Kinerja Dan Sistem Pemeliharaan Generator Set (Genset) Pada Apartement Green Central City. Aisyah Journal of Informatics and Electrical Engineering (AJIEE), 5(1), 88-97
SNI 0225:2020. Persyaratan Umum Instalasi Listrik (PUIL 2020). Jakarta: Badan Standardisasi Nasional
SNI IEC 62305. (2024). Proteksi terhadap Petir. Jakarta: Badan Standardisasi Nasional
Zaldi, R. A. D. (2025). Analisa Pengukuran Tahanan Isolasi Dan Polarization Index Motor Induksi 3 Fasa Di PT PN Cinta Manis. Disertasi. Politeknik Negeri Sriwijaya.

