Perancangan Area Incoming Material Berbasis 5S Untuk Mengurangi Waste of Motion pada PT XYZ
DOI:
https://doi.org/10.25170/jpk.v3i06.8409Keywords:
5S, floor marking, incoming material area, vertical storage rack, waste of motionAbstract
PT XYZ is a manufacturing company engaged in the fabrication and integration of electrical systems with a Make to Order (MTO) production system. Currently, the company's incoming material area does not have a standardized arrangement system, so electrical components are placed without clear classification and labeling. An evaluation of existing conditions was carried out using a 5S audit and observation of material search time for 25 actual working days. The audit results showed a 5S achievement percentage of 20.8%, with the Seiton element as the most critical at 6.3%, Meanwhile, the average time spent searching for materials, based on 42 observed samples, was recorded at 5.83 minutes per visit, resulting in a waste of 69.96 minutes per day—or 16.7% of total effective working hours. Based on these results, improvements are proposed through the design of floor marking with a division of three zones and a configuration of 10 vertical storage rack units with a total surface capacity of 24.00 m², equipped with a labeling system per slot. Based on the trial results, the implementation of both proposed improvements is projected to reduce material search time by up to 60%, resulting in a savings of 42.00 minutes per day or an equivalent of 10.0% of the daily effective working hours that can be diverted to productive activities.
References
Aditya, M., Permana, E., & Dwiyanti, V. (2026). Peran Pengendalian Visual Berbasis 5S Dalam Mengurangi Pemborosan Waktu Pada Operasi Gudang. INAQUE Journal of Industrial & Quality Engineering, 14(1), 17–27. https://doi.org/10.34010/iqe.v14i1.19249. Diakses 21 Juli 2026
Astharina, V., & Suliantoro, H. (2016). Analisis Penerapan 5S+Safety Pada Area Warehouse di PT. Bina Nusantara Busana Internusa Group, Semarang. Industrial Engineering Online Journal, 5(4). Retrieved from https://ejournal3.undip.ac.id/index.php/ieoj/article/view/14078. Diakses 12 Agustus 2026
Astuti, S., Lusia, V., & Khairunnisa, A. (2020). Perhitungan Waktu Standart Untuk Menentukan Tenaga Kerja dan Kebutuhan Mesin / Alat Pada Proses Produksi Reagen Alat/Asat (GPT) FS (IFCC mod) di PT. PDL. Jurnal KaLIBRASI - Karya Lintas Ilmu Bidang Rekayasa Arsitektur Sipil Industri, 3(2), 1–19. https://doi.org/10.37721/kalibrasi.v3i2.738
Fitri, T. Z., & Putra, R. D. E. (2024). Implementation of 5S in the manufacturing industry. Journal of Engineering Science and Technology Management (JES-TM), 4(2), 76–82. https://doi.org/10.31004/jestm.v4i2.189 .Diakses 2 Agustus 2026
Haritsal, A. (2020). Rekomendasi Perbaikan Warehouse Dengan Pendekatan Metode 5S (Studi Kasus: PT Sari Warna Asli Garment). Industrial Engineering Online Journal, 13(4). Retrieved from https://ejournal3.undip.ac.id/index.php/ieoj/article/view/47546 . Diakses tanggal 20 Juli 2026
Havi, N. F., Lubis, M. Y., & Yanuar, A. A. (2018). Penerapan Metode 5s untuk Meminimasi Waste Motion pada Proses Produksi Kerudung Instan di CV. Xyz dengan Pendekatan Lean Manufacturing. JISI Jurnal Integrasi Sistem Industri, 5(2), 123–130. https://doi.org/10.24853/jisi.5.2.123-130
Kumar, R. R., Ganesh, L., & Rajendran, C. (2021). An entropy based approach to 5S maturity. Materials Today Proceedings, 46, 8103–8110. https://doi.org/10.1016/j.matpr.2021.03.048 .Diakses 20 Agustus 2026
Mohamud, I. H., Kafi, M. A., Shahron, S. A., Zainuddin, N., & Musa, S. (2023). The Role of Warehouse Layout and Operations in Warehouse Efficiency: A Literature review. Journal Européen Des Systèmes Automatisés, 56(1), 61–68. https://doi.org/10.18280/jesa.560109. Diakses 2 Agustus 2026
Putra, G. D., & Momon, A. (2023). Analisis lingkungan kerja pada area gudang garmen menggunakan metode 5S di PT XYZ. JENIUS Jurnal Terapan Teknik Industri, 4(1), 131–142. https://doi.org/10.37373/jenius.v4i1.531 . Diakses 19 Juli 2026
Randhawa, J. S., & Ahuja, I. S. (2017). Evaluating impact of 5S implementation on business performance. International Journal of Productivity and Performance Management, 66(7), 948–978. https://doi.org/10.1108/ijppm-08-2016-0154. Diakses 3 Agustus 2026
Rosa, M. F., Suryadhini, P. P., & Astuti, M. D. (2019). Penerapan 5S untuk mereduksi waste motion di CV. Marasabessy dengan pendekatan lean manufacturing. e-Proceeding of Egineering, 6(2), 6465-6476. Retrieved from https://openlibrarypublications.telkomuniversity.ac.id/index.php/engineering/en/article/view/9952/ Diakses 21 Agustus 2026
Saderova, J., Rosova, A., Sofranko, M., & Kacmary, P. (2021). Example of warehouse system design based on the principle of logistics. Sustainability, 13(8), 4492. https://doi.org/10.3390/su13084492 . Diakses 2 Agustus 2026
Shahriar, M., Parvez, Islam, M., & Talapatra, S. (2022). Implementation of 5S in a plastic bag manufacturing industry: A case study. Cleaner Engineering and Technology, 8, 100488. https://doi.org/10.1016/j.clet.2022.100488 . Diakses 21 Agustus 2026
Sundharesalingam, D., Hemalatha, M., Priya, D., & Mohanasundari, D. (2020). Implementation of 5S to improve the productivity of detergent manufacturing industry. International Journal of Recent Technology and Engineering (IJRTE), 8(6), 3858–3863. https://doi.org/10.35940/ijrte.f9423.038620 . Diakses 2 Agustus 2026