Analysis of Power Cable Sizing and Voltage Drop in the Upgrading Stasiun Pengumpul Puspa Asri 2 Project

Authors

  • Putri Wulandari Professional Engineering Program, School of Bioscience, Technology and Innovation, Atma Jaya Catholic University of Indonesia, Jakarta 12930, INDONESIA
  • Linda Wijayanti Professional Engineering Program, School of Bioscience, Technology and Innovation, Atma Jaya Catholic University of Indonesia, Jakarta 12930, INDONESIA

DOI:

https://doi.org/10.25170/jurnalelektro.v19i2.8139

Keywords:

Ampacity, Cable Sizing, Derating Factor, Voltage Drop, Short Circuit Withstand

Abstract

The upgrading of oil and gas production facilities requires an electrical power distribution system that is reliable, safe, and compliant with voltage quality limits. This article discusses power cable sizing and voltage drop evaluation for the Puspa Asri Gathering Station Phase 2 Upgrading Project in Jambi, based on engineering documents for calculating cable sizing and voltage drop in the Puspa Asri Phase 2 Collector Station Upgrading Project. The method includes load identification, full-load current calculation, determination of cable current-carrying capacity after temperature and grouping correction factors, verification of voltage drop under steady-state and motor-starting conditions, and assessment of thermal withstand capability under short-circuit conditions. The design criteria refer to IEC 60364-5-52 and related standards, with voltage drop limits of 2% for switchgear/MCC-to-switchgear/MCC routes, 5% for motor terminals under normal operating conditions, 15% during motor starting, and 3% for distribution panel feeders. The evaluation of 16 main cable routes shows that all selected cables satisfy the requirements for ampacity, voltage drop, and short-circuit withstand capability. The selected cable sizes range from 3C+E 4 mm² to 4C+E 95 mm², using a temperature correction factor of 0.91 and a grouping derating factor of 0.79 for aboveground installation. The Water Injection Pump C case study shows that the selected 4C+E 35 mm² cable has a corrected current-carrying capacity of 90.58 A, which is greater than the design current of 47.03 A, with a steady-state voltage drop of 1.33% and a motor-starting voltage drop of 3.95%. Therefore, the cable design is considered technically feasible to support reliable operation of the production facility.

References

[1] M. P. Nair and K. Nithiyananthan, “An Effective Cable Sizing Procedure Model for Industries and Commercial Buildings,” Int. J. Electr. Comput. Eng., vol. 6, no. 1, pp. 34–39, Feb. 2016, doi: 10.11591/ijece.v6i1.pp 34-39.

[2] F. Selim, A. Y. Abdelaziz, I. B. M. Taha, and M. I. Abdelwanis, “A probabilistic approach for power cable cross section area selection: Most economic design by computer aided,” Heliyon, vol. 8, no. 12, Art. no. e12049, Dec. 2022, doi: 10.1016/j.heliyon.2022.e12049.

[3] P. Albrechtowicz and D. Smugała, “Short-Circuit Conditions and Thermal Behaviour of Different Cable Formations,” Energies, vol. 17, no. 17, Art. no. 4395, Sep. 2024, doi: 10.3390/en17174395.

[4] S. H. Alwan, A. K. Jasim, and Y. F. Hasan, “Derating Factors for Underground Power Cables Ampacity in Extreme Environmental Conditions: A Comparative Study,” Int. J. Heat Technol., vol. 41, no. 3, pp. 709–715, Jun. 2023, doi: 10.18280/ijht.410325.

[5] Z. Hu, X. Ye, Q. Li, X. Luo, Y. Zhao, H. Zhang, and L. Zhang, “Analysis on three-core power cable temperature field and ampacity model under typical laying environment,” Front. Energy Res., vol. 12, Art. no. 1430501, Jul. 2024, doi: 10.3389/fenrg.2024.1430501.

[6] G. Callender, K. F. Goddard, J. K. Dix, and P. L. Lewin, “A Flexible Model to Calculate Buried Cable Ampacity in Complex Environments,” IEEE Trans. Power Del., vol. 37, no. 3, pp. 2007–2015, Jun. 2022, doi: 10.1109/TPWRD.2021.3102414.

[7] A. Paramonov, S. Oshurbekov, V. Kazakbaev, V. Prakht, and V. Dmitrievskii, “Investigation of the Effect of the Voltage Drop and Cable Length on the Success of Starting the Line-Start Permanent Magnet Motor in the Drive of a Centrifugal Pump Unit,” Mathematics, vol. 11, no. 3, Art. no. 646, Jan. 2023, doi: 10.3390/math11030646.

[8] J.-R. Riba and J. Llauradó, “A Model to Calculate the Current–Temperature Relationship of Insulated and Jacketed Cables,” Materials, vol. 15, no. 19, Art. no. 6814, Sep. 2022, doi: 10.3390/ma15196814.

[9] IEC 60502-1:2021, Power cables with extruded insulation and their accessories for rated voltages from 1 kV (Um = 1.2 kV) up to 30 kV (Um = 36 kV)—Part 1: Cables for rated voltages of 1 kV and 3 kV. Geneva, Switzerland: International Electrotechnical Commission, 2021.

[10] IEC 60228:2023, Conductors of insulated cables. Geneva, Switzerland: International Electrotechnical Commission, 2023.

[11] IEC 60287-1-1:2023, Electric cables—Calculation of the current rating—Part 1-1: Current rating equations (100% load factor) and calculation of losses—General. Geneva, Switzerland: International Electrotechnical Commission, 2023.

[12] IEC 60034-2-1:2024, Rotating electrical machines—Part 2-1: Standard methods for determining losses and efficiency from tests. Geneva, Switzerland: International Electrotechnical Commission, 2024.

[13] IEC 60364-5-52:2009+AMD1:2024 CSV, Low-voltage electrical installations—Part 5-52: Selection and erection of electrical equipment—Wiring systems. Geneva, Switzerland: International Electrotechnical Commission, 2024.

[14] IEC 60364-4-43:2023, Low-voltage electrical installations—Part 4-43: Protection for safety—Protection against overcurrent. Geneva, Switzerland: International Electrotechnical Commission, 2023.

[15] NFPA 70, National Electrical Code (NEC), 2026 ed. Quincy, MA, USA: National Fire Protection Association, 2026.

Published

2026-10-19

Issue

Section

Power Engineering and Renewable Energy