Perancangan Jadwal Penggantian dan Persediaan Komponen Mesin Cutting

Authors

  • Trifenaus Prabu Hidayat Fakultas Teknik, Universitas Katolik Indonesia Atma Jaya
  • Andre Sugioko Fakultas Teknik, Universitas Katolik Indonesia Atma Jaya
  • Vebryna Shaputri Siagian Fakultas Teknik, Universitas Katolik Indonesia Atma Jaya
  • Maria Angela Kartawidjaya Fakultas Teknik, Universitas Katolik Indonesia Atma Jaya
  • Ronald Sukwadi Fakultas Teknik, Universitas Katolik Indonesia Atma Jaya
  • Marsellinus Bachtiar Wahju Fakultas Teknik, Universitas Katolik Indonesia Atma Jaya

DOI:

https://doi.org/10.25170/metris.v24i02.4694

Keywords:

Preventive maintainance, model p, schedule

Abstract

PT. X is a garment industry company that produces clothing products. PT. X has not implemented a maintenance or machine maintenance system. Currently, the company only performs machine maintenance when they are damaged. This causes losses for the company because it can disrupt the smooth running of the production process, such as sudden engine damage, which can cause high machine downtime. Therefore, maintenance of machines is needed in the form of a schedule for replacing and checking cutting machine components with a Preventive maintenance approach to support the production process at the company. In addition to generating replacement schedules and inspecting engine components, Implementing the proposed Preventive maintenance takes the scheduling for maintenance and cleaning of cutting machines. After the replacement schedule and inspection of engine components are generated, it will affect the inventory of engine components. The inventory system proposed is the inventory system model P. Model P is chosen because it is in accordance with the condition of the company and meets the requirements of the model P inventory system. The P inventory system produces a cost of Rp. 22,508,709.

Downloads

Published

2023-12-04

Issue

Section

Articles
Abstract views: 95 | PDF downloads: 126